home  contact  

Ana Sayfa > Gündem

Online Service
e-government
 
Online Ziyaretçi:3033
Contracts for Two Metro Lines signed in Istanbul…

Under the slogan, “The Metro Everywhere, the Metro to Every Place” with the name and signature of the Istanbul Mayor, Kadir Topbaş, two new metro lines, Çekmeköy-Sancaktepe-Sultanbeyli Metro Line and Sarıgazi-Taşdelen-Yenidoğan Metro Line, which are rapid transit lines of the Istanbul Metro system on the Asian part of Istanbul are to be completed in 2020.

5/5/2017 12:00:00 AM

A contract for the construction of two sections of metro line on the Asian side of Istanbul was signed in the presence of the city’s mayor Mr Kadir Topbaş at a ceremony in the Saraçhane Municipal Building on May 5th, 2017.

The civil works contract, which was awarded to Turkish construction companies Doğuş, Özaltın, and Yapi Merkezi, encompasses the 10.9km eastern section of Line M5 from Çekmeköy to Sancaktepe and Sultanbeyli composed of nine new stations and the Sarıgazi - Taşdelen - Yenidoğan line with 6,95 km long composed of six new stations.

The total cost of the two sections is Lira 2.34bn ($US 650m) and both are due to open in 2020.

Çekmeköy-Sancaktepe-Sultanbeyli Metro line: 10,9 km. Completion is planned as 2020.

Sarıgazi-Taşdelen-Yenidoğan Metro Line: 6,95 km. Completion is planned as 2020.




Resim Galerisi
( 1 / 5 )


Advertisement


TRAFFIC VIEWS
 
CITY GUIDE
 
Turistic Cameras
 
Seoul Metropolitan Government
 
Strategic Plan 2015-2019
 
IMM Infrastructure
 
Istanbul Metropolitan Area-2010 GHG Inventory
 
THE WORK OF THE PROCUREMENT AND COMMISSIONING OF 120 METRO VEHICLES FOR DUDULLU - BOSTANCI AND MAHMUTBEY - ESENYURT METRO LINES AND RAILED PUBLIC TRANSPORTATION SYSTEMS
 
Healthplus Istanbul
 


Istanbul Metropolitan Municipality   Head Office Saraçhane: +90 212-455 1300
Merter: +90 212 4494000,  webmaster@ibb.gov.tr  click for application to Beyazmasa